Feasibility study for the installation of a chromatography system

crm

Location: RUSSIA
Economic value of project: € 0.2M

Year: 2011

In 2011, Sadam Engineering conducted a feasibility study to install a new chromatography system at a sugar factory belonging to a leading Russian sugar manufacturing group.

The subject of the study was the green field installation of a desugaring system using chromatography. With an estimated system capacity of 300 t/d of molasses, the project also included the processing of molasses from other sugar factories in the same region. Hence, a suitable logistics organisation allowing the transport of molasses from various sugar factories in the area was also part of the study. Furthermore, the project included integration with the utilities of the existing system.